Required information to obtain building permit to construct pole buildings:

  • Two sets of plans, including:
  • Cross section with beam sizes ” post spacing and sizes
  • Depth-roof purlin grade, size, and spacing
  • Elevations Floor plan with dimensions
  • Footing sizes
  • Copy of manufacturer’s truss design.
  • For questions regarding permits call 651-213-8372.
  • Note: In Rural Residential Zoning Districts the exterior appearance and color of accessory buildings shall match the dwelling as close as possible. Boxed eaves and rakes are required if present on home. The height of non-agricultural accessory buildings in the rural residential districts shall not exceed the height of the principal structure (house).

    pole building house

     

    Required Inspections

    Site: before permit is issued (house height and setbacks will be verified)

    Footing: after footing excavation before concrete is placed

    Framing: after main framing is complete.

    Final: after building is complete and final grading is done (Framing and final inspections can be combined if interior of building is not to be finished)

    metal pole barn house

     

  • Electrical: by electrical inspector (763-633-9148)
  • General Guidelines
  • Footings – minimum footing depth is 42 inches. Footings must be poured concrete or precast

    Snow Load ” Chisago County ” 50# ground load.

    Roof Purlins ” Size and spacing for trusses 8 foot on center:

  • #2 SPF 2 x 4 Maximum spacing 18 inches on center
  • #2 SPF 2 x 6 Maximum spacing 24 inches on center
  • MSR 1650 2 x 4 Maximum spacing 24 inches on center
  • Code questions can be directed to Jim Schneider at 651-213-8381, or Justin Colberg at 651-213-8377.